S.No PERTICULARS DETAILS
1 State Telangana
2 Name of Project Four Laning of NH-161 from Ramsanpally (Design Km 39.980/Existing Km.44.757) to Mangloor (Design Km. 86.788/Existing Km.91.350) (Design Length=46.808kms) in the State Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode.
3 Project Type Hybrid Annuity Mode (HAM)
4 Client National Highways Authority of India
5 Concessionaire KNR Shankerampet Projects Private Limited
6 EPC Contractor KNR Constructions Limited
7 Length of Highway (In Km.) 46.808
8 Construction Period 730 Days from Appointed Date
9 Concession Period 730 Days + 15 years from COD
10 Date of LOA 26/03/2018
11 Date of Signing the Agreement 09/05/2018
12 Appointed Date 02/05/2019
13 Independent Engineer M/S Centro de E studios de Materials, Y Control de obra SA in. With M/s Armenge Engineering and Management Consultant Pvt. Ltd.